> ## Documentation Index
> Fetch the complete documentation index at: https://docs.vortexiq.ai/llms.txt
> Use this file to discover all available pages before exploring further.

# Open Claims, Interlink Express

> Open Claims for Interlink Express stores. Tracked live in Vortex IQ Nerve Centre. How to read it, why it matters, and how to act on it.

**Metrics type:** [Key Metrics](/nerve-centre/overview#metrics-types-explained)  •  **Category:** [Shipping & Courier](/nerve-centre/connectors#connectors-by-type)

## At a glance

> Live count of Interlink Express service-failure and damage claims that the merchant has filed and Interlink has not yet resolved. Each open claim is real-time money: carriage refund (typically £8 to £18 per Pre10:30 / Pre12 / Next-Day consignment) plus contents-value compensation up to standard cover or higher with Enhanced Compensation Cover. The card surfaces filing-and-resolution velocity.

|                                 |                                                                                                                                                                                                                                                                                   |
| ------------------------------- | --------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- |
| **What it counts**              | `COUNT(claims WHERE status IN ('OPEN','UNDER_REVIEW','PENDING_DOCUMENTATION','AWAITING_INTERLINK_RESPONSE'))` at the moment of read. Real-time, not period-windowed.                                                                                                              |
| **Claim categories**            | Service-failure (carrier-fault late delivery on Pre10:30 / Pre12 / Next-Day), damage in transit, lost in transit, Enhanced Compensation Cover claims for high-value contents. Customer-fault and address-fault claims are not eligible.                                           |
| **Filing window**               | Interlink's published filing window is **14 days from failed POD** for service-failure claims; **14 days from delivery (or expected delivery)** for damage / loss claims. Tighter than Parcelforce (30 days), match APC.                                                          |
| **Resolution SLA**              | Interlink typically settles service-failure claims within 7 working days and damage claims within 14 to 21 working days. Anything sitting open past 21 working days is unusual and should be chased.                                                                              |
| **Currency**                    | GBP. UK-domestic only; Interlink does not run a meaningful international tier.                                                                                                                                                                                                    |
| **Money-back-on-late mechanic** | Service-failure refund returns the carriage charge only (not the goods value). Damage / loss claim returns goods value (subject to Enhanced Compensation Cover limit if applicable). A late-and-damaged consignment can yield both refunds.                                       |
| **Standard compensation cap**   | Interlink standard liability is typically £100 per consignment; Enhanced Compensation Cover lifts to £2,500 (£5,000 on some account-level negotiated terms) for an additional fee. Buy ECC on consignments above £100 contents value where the cover fee is under 5% of contents. |
| **B2B vs B2C**                  | Pooled. B2B claim values usually higher (corporate contents are higher-value); B2B filing rate typically higher (ops team is procurement-disciplined).                                                                                                                            |
| **Time window**                 | `RT` (real-time)                                                                                                                                                                                                                                                                  |
| **Alert trigger**               | `>0 unresolved >7d`. Any claim sitting open more than 7 days trips the gauge.                                                                                                                                                                                                     |
| **Roles**                       | owner, operations, finance                                                                                                                                                                                                                                                        |

## Calculation

Calculated automatically from your Interlink Express data. See the At a glance summary above for what the metric tracks and the worked example below for a typical reading.

## Worked example

A UK B2B-leaning industrial-supplies merchant: corporate workshops, factories, contractors. Pre10:30 contracted on healthcare supply lines; Next-Day for general industrial. Reading taken at 14:00 GMT on 22 Mar 26.

| Claim category                           | Count open | Avg open age | Total claim value      |
| ---------------------------------------- | ---------- | ------------ | ---------------------- |
| Service-failure (Pre10:30 late)          | 14         | 3 days       | £252 (carriage refund) |
| Service-failure (Next-Day late)          | 22         | 5 days       | £198 (carriage refund) |
| Damage in transit (industrial parts)     | 6          | 11 days      | £980 (contents)        |
| Lost in transit                          | 1          | 9 days       | £340 (contents)        |
| Enhanced Comp Cover (high-value tooling) | 2          | 16 days      | £1,420 (contents)      |
| **Total open**                           | **45**     |              | **£3,190**             |

The card reads **45** with 9 of them sitting >7 days, tripping the alert. Five things to notice:

1. **The 7-day threshold has 9 hits, all damage / lost / ECC.** Service-failure claims (the 36 newer claims) typically clear in 7 working days under Interlink's tight SLA; damage / lost / ECC stretch to 14 to 21. The 9 older claims are Interlink-side awaiting and should be chased via the account team.
2. **£3,190 of working capital is parked.** For a B2B-mid-market merchant on £15K monthly Interlink spend, this is meaningful cash. Interlink's tight 14-day filing window forces faster filing; the trade-off is faster resolution. Net working-capital exposure is lower than equivalent Parcelforce footprint.
3. **The 14 Pre10:30 claims correlate with healthcare-account medication misses.** Pre10:30 misses on healthcare carry contractual penalties (£25 to £100 per missed delivery). Carriage-refund recovery at £252 is the visible recovery; B2B contract penalty exposure is not surfaced here and runs \~£700 in addition. Track on a finance-team spreadsheet.
4. **Damage-in-transit at 6 claims for industrial parts is unusual.** Industrial parts are typically robust; cluster of 6 in a period suggests packaging review (heavier-grade carton, additional foam wrapping) or potentially a single-depot handling issue. Pair with `int_route_otd` to see if any depot stands out.
5. **Filing rate vs eligible-rate matters more than the open count.** If `int_late_shipments_count` showed 60 carrier-fault eligible misses this period, only 36 are filed (60% filing rate, industry-benchmark). Healthy discipline; some accounts run 80%+ on Interlink because of the tight 14-day window forcing the cadence.

## Sibling cards merchants should reference together

Open claims is the real-time financial-recovery KPI. Pair with these:

| Card                                                                                              | Why pair it with Open Claims                                            | What the combination tells you                                                                                       |
| ------------------------------------------------------------------------------------------------- | ----------------------------------------------------------------------- | -------------------------------------------------------------------------------------------------------------------- |
| [Late Shipments](/nerve-centre/kpi-cards/interlink-express/late-shipments)                        | Eligibility-source for service-failure claims. Filing rate calculation. | Filing rate gap = unrecovered carriage. Industry benchmark 60 to 80% on Interlink (14-day window forces discipline). |
| [Exception Rate](/nerve-centre/kpi-cards/interlink-express/exception-rate)                        | Damage / loss exceptions feed claim filings.                            | Predictive of next week's filing volume.                                                                             |
| [Claim Value](/nerve-centre/kpi-cards/interlink-express/claim-value)                              | The financial twin.                                                     | Count vs value diverges with high-value ECC claims.                                                                  |
| [Pre-10:30 Service Promise](/nerve-centre/kpi-cards/interlink-express/pre-10-30-service-promise)  | The most-claimed cohort (B2B contract).                                 | Pre10:30 SLA dip = predictable claim volume rise.                                                                    |
| [On-Time Delivery Rate](/nerve-centre/kpi-cards/interlink-express/on-time-delivery-rate)          | Customer-experience root cause.                                         | OTD drop + claims flat = ops filing-disciplined; issue is upstream.                                                  |
| Cross-connector: [`shopify.refund_rate`](/nerve-centre/kpi-cards/shopify/refund-rate)             | Downstream impact. Damage = refund + claim recovery (separate streams). | Combined view = net financial exposure.                                                                              |
| Cross-connector: [`apc.apc_open_claims`](/nerve-centre/kpi-cards/apc/open-claims)                 | Peer UK premium. Same 14-day filing window.                             | Compare resolution velocity.                                                                                         |
| Cross-connector: [`parcelforce.par_open_claims`](/nerve-centre/kpi-cards/parcelforce/open-claims) | Peer, 30-day window.                                                    | Different filing cadence; longer working-capital cycle.                                                              |
| Cross-connector: [`dpd.dpd_open_claims`](/nerve-centre/kpi-cards/dpd/open-claims)                 | Sister-brand.                                                           | Same parent group claims process.                                                                                    |

## Reconciling against the vendor's own dashboard

**Where to look in Interlink Express's own dashboard:**

[Interlink Express MyDPD Business](https://www.interlinkexpress.com/) → **Claims → Open Claims**. Lists each open claim by reference, filing date, status, and amount.

**Why our number may legitimately differ from Interlink's portal:**

| Reason                             | Direction           | Why                                                                                                                                                     |
| ---------------------------------- | ------------------- | ------------------------------------------------------------------------------------------------------------------------------------------------------- |
| **Status mapping**                 | Either              | Interlink's status labels (`OPEN`, `UNDER_REVIEW`, `PENDING_DOCUMENTATION`, `SETTLED`, `REJECTED`, `WITHDRAWN`); the card pools all non-final statuses. |
| **Sync lag**                       | Ours \<2 min behind | Card polls Interlink claims API every 30 to 90 seconds.                                                                                                 |
| **Account-level vs invoice-level** | Either              | Multiple Interlink accounts can be filtered in the portal; the card pools by connected credentials.                                                     |

**Cross-connector reconciliation:**

| Card                                                                             | Expected relationship                                      | What causes legitimate divergence                                                  |
| -------------------------------------------------------------------------------- | ---------------------------------------------------------- | ---------------------------------------------------------------------------------- |
| [`shopify.refund_rate`](/nerve-centre/kpi-cards/shopify/refund-rate)             | Refunds and claims are two sides of the same damage event. | Refund rate moves with delivery experience generally; claims move only when filed. |
| [`apc.apc_open_claims`](/nerve-centre/kpi-cards/apc/open-claims)                 | Peer UK premium.                                           | Different consignments.                                                            |
| [`parcelforce.par_open_claims`](/nerve-centre/kpi-cards/parcelforce/open-claims) | Peer, different network.                                   | Different consignments, different filing windows.                                  |

## Known limitations / merchant FAQs

**Why is Interlink's filing window 14 days?**
DPD-group ops cadence. Interlink trades a tighter merchant-side filing window for faster claim resolution (7 working days for service-failure, 14 to 21 for damage). Most merchants transitioning from Parcelforce (30 days) under-file because the muscle memory is wrong. Set up a weekly review tied to `int_late_shipments_count` and file within 7 days of the event.

**What documentation does Interlink require for a damage claim?**
Photos of damage and packaging (showing Interlink label and damage to outer box), consignment number, original purchase receipt or stock-transfer note, and customer declaration confirming damage on receipt. For Enhanced Compensation Cover claims add cover-purchase confirmation. Missing any and Interlink holds at `PENDING_DOCUMENTATION`.

**Can we file claims at scale via API?**
MyDPD Business has bulk-CSV upload for accounts above \~£3K monthly Interlink spend (account-team feature). API-based claim filing is in pilot for select large merchants. Most mid-size merchants file via portal manually; the 14-day window forces a weekly cadence that fits a 30-min review slot.

**Service-failure refund vs damage claim: how do we decide?**
File both if both apply. A late-and-damaged consignment yields service-failure refund (carriage charge back) plus damage claim (contents compensation). Interlink treats them as separate claims under one consignment number.

**Why does a claim sit at "PENDING\_DOCUMENTATION" for weeks?**
Almost always because Interlink has requested additional information and the merchant has not responded. Check MyDPD Business *Claims → Action Required*. Common asks: clearer damage photos, customer signature on damage declaration, original purchase receipt for high-value contents. Resolution clock pauses while waiting.

**B2B contract-penalty claims: are these surfaced here?**
No. The card surfaces Interlink-side claims only. B2B contract penalties (merchant owes the B2B customer for missed Pre10:30 on a corporate account) sit in CRM / accounting. Pair this card with `interlink_xc_otd_by_channel` to see B2B-channel OTD as the leading indicator of contract-penalty exposure.

**Can we appeal a rejected claim?**
Yes. MyDPD Business has an *Appeal* button on rejected claims. Most appeals succeed when rejection was for missing documentation that has since been provided. Appeals against fault-attribution are slower; provide third-party evidence (driver-camera if recorded, neighbour-witness statement).

**Enhanced Compensation Cover: when is it worth buying on Interlink?**
Standard cap is £100; ECC lifts to £2,500 for an additional fee of £2 to £8 per consignment depending on cover level. Worth it for any consignment where contents value is above £100 and cover fee is under 5% of contents. For a £500 industrial part, £4 is rational; for a £150 commodity item, £4 may not be.

**Compared to Parcelforce, where is Interlink's claim process better or worse?**
Better: faster resolution (7 vs 10 working days for service-failure), tighter filing window forces ops discipline. Worse: tighter filing window means lost recovery if a weekly review slips; less generous appeal flexibility on customer-fault edge cases. Net: Interlink rewards disciplined ops teams, penalises lax ones.

**During Q4 peak, claim volume triples; will Interlink keep up?**
Resolution SLA stretches by 5 to 10 days during Q4. Anything sitting open past 21 days during peak is normal, not an Interlink failure. Pre-negotiate a Q4 claims-cadence with the account manager. The card will look worse than non-peak; reset weekly-review expectations accordingly.

***

### Tracked live in Vortex IQ Nerve Centre

*Open Claims* is one of hundreds of KPI pulses Vortex IQ tracks across Interlink Express and 70+ other ecommerce connectors. Nerve Centre runs the detection layer; Vortex Mind investigates the cause when something moves; Ask Viq lets you interrogate any number in plain English.

[Start for free](https://app.vortexiq.ai/login) or [book a demo](https://www.vortexiq.ai/contact-us) to see this metric running on your own data.
